Designing habit-forming, delightful products grounded in deep customer understanding

I'm a hands-on design leader who focuses on understanding our customers, defining strategy and unlocking the team for success, while still diving in and owning the details.

Feb 2024 – PresentMiroProduct Design Manager

Making Miro the perfect fit for every organisation

I led design across the Custom Solutions and Integrations departments, enabling multiple initiatives that let organisations customise Miro.

They range from Home and Spaces, where users organise and discover content, to Miro Build, which lets enterprise organisations build a custom solution on top of Miro that shows where the work is happening.

On the canvas, we built custom widgets that let users generate a solution for any problem, plus custom integrations and the Miro MCP, which let organisations bring their data into Miro and use it as a source of truth. On the foundations side, Brand Center and Design Context are defined at an organisation level, so every user can access them and AI can generate on-brand content.

Highlights

  • Grew the design team from 2 to 8 designers, content writers and researchers
  • Launched two products from 0 to 1, and on to tens of thousands of users
  • Evolved Brand Center into the foundation for on-brand AI generation with Design Context
  • Built close relationships with enterprise customers through co-design workshops
  • A concept for a Create screen in Miro, with suggested templates for you, your team and trending, and options to start a board or space from scratch
    Prototyping concepts to push the thinking of how creation works
  • A Miro board laying out the Custom Solutions vision deck: section slides for Stream Overview, Company Customization, Custom Widgets and Home & Spaces, each followed by its slides
    Setting the vision of a customised Miro, end to end

    60+enterprise deals enabled through custom solutions

  • A Miro board mapping the admin and solution builder journey, with rows of sticky notes for the user journey, insights and pain points, opportunities and open questions
    Leading customer journey mapping sessions with customers and stakeholders
  • A Figma file of Brand Center screens grouped into admin and end-user experience sections, with designer avatars pinned across it
    Using design and storytelling to set the long-term strategy for Brand Center and Design Context in Miro

    200korgs set up and using Brand Center daily

  • An AI chat beside an architecture diagram in Miro, asking the user to connect Miro MCP before it documents the architecture
    Designing AI conversations and setting direction for the Miro MCP platform

    1.7musers using Miro MCP to generate content in Miro

  • Adobe's LinkedIn post sharing Miro's announcement of the Miro and Adobe Express integration, with a campaign board shared by a designer and a campaign manager
    Designing experiences for Miro and our partners to solve customer needs
  • Warwick's strength is in systems-level product thinking and design leadership in complex, ambiguous spaces. He consistently brings clarity, trust, and structure to cross-functional work, and helps teams move forward with strong alignment, especially across Design, Product, Engineering, and Partnerships. He also plays a strong leadership role in design, setting direction, keeping momentum, and helping teams work through uncertainty.
    KostaGPM Integrations, Miro
    I'm always blown away by Warwick's broad expansive thinking and knowledge and how he can zoom into the tiniest detail or zoom out to think really strategically. I also love the positivity and straight-talking approach he brings. He leads designers to be better versions of themselves, and helps them hone their craft by generously sharing his own knowledge.
    RachelLeading content design, Miro
    Warwick was critical in both ideation and designing of workflows for users. … Warwick leveraged his experience working with Admins in the past to help us define a plan and UX design for how Admins would enable Miro's MCP for their organizations. Overall Warwick was instrumental to the thinking, ideation and design of our MCP Experience.
    CharlesLead PM, Dev Ecosystem, Miro
Aug 2022 – Feb 2024MiroStaff Product Designer

Leading design to bring Miro to every device

I designed, shipped and launched features across Miro's device ecosystem, from mobile and tablet to the interactive display experience that brings Miro into the meeting room.

The work ranged from small experiments that lifted engagement, sign-ups and board creation while cutting errors and undos, to brand new mobile features Miro never had before, including Talk Track and Miro Docs and Tables.

Beyond my own features, I helped other teams make theirs work on touch. I coached them on designing for phones, tablets and touchscreen laptops, designed out the mobile design system, and supported accessibility across every device.

Highlights

  • Launched new mobile features Miro never had before, including Talk Track and Miro Docs and Tables
  • Ran experiments that lifted engagement, sign-ups and board creation
  • Designed the mobile design system and supported accessibility across every device
  • Coached other teams on designing for phones, tablets and touchscreen laptops
  • A kick-off deck presented on a meeting-room display, mirrored on a phone alongside participant video tiles
    Winning the meeting room with interactive displays and cross-device experiences

    2korgs adopted Interactive Displays

  • Redesign of mobile home, designed, built and pushed with AI

    2×MAU for usage on mobile

  • A group seated around a long meeting-room table, watching a presentation on a wall-mounted screen
    Presenting at the Miro Executive Briefing Centre
  • A row of Miro mobile screens for docs, data tables, slides and talk track, laid out on a board
    Evolving Mobile to support advanced Miro features like docs, data tables, slides and talk track

    12%reduction in undos on the canvas

  • Concept of a Miro board floating in a virtual room on Apple Vision Pro
    Concepts on how Miro would work across VR environments like Apple Vision Pro
  • Warwick supports the Cross-Device (CD) team as a design leader and helps to shape our strategy. … over the course of 2024 we advanced from the catch-up team to a solid platform that is utilized by AMPED teams.
    RomanLead PM, Cross Device, Miro
Jan 2021 – Jul 2022Booking.comDesign Manager & Lead Designer

Sweating the details between booking and the holiday itself

In 2021 I took on Book-to-Stay at Booking.com: everything a traveller sees after they book, until they arrive. Over the next year I grew the team from three designers working on help products to eight designers, two copywriters and a researcher, covering the whole trip from accommodation to flights and car rentals.

Booking.com is many departments, but to a traveller it's one product, so I worked to make the trip feel that way. That meant treating the 35 or so designers in other teams who touched it as if they were on mine. A fortnightly design review brought around 30 of them together across every trip type, alongside weekly co-working, a marketing review on cross-sell, and a monthly showcase that kept the wider organisation focused on customers' real problems.

I also changed how the work was shared. Figma was organised around the product rather than the org chart, with every screen visible in one end-to-end file, so designers could build on each other's work without hunting down who owned what.

Highlights

  • Grew the team from 3 designers to 8 designers, 2 copywriters and a researcher
  • Brought around 30 designers together across every trip type in a fortnightly design review
  • Ran a monthly showcase that kept the wider organisation focused on customer problems
  • Organised Figma around the product, with every screen in one end-to-end file
  • Five Booking.com mobile screens showing upcoming trips, a trip overview, and accommodation, flight and car rental booking details
    Building out the trip management platform across several verticals and collaborating with 30+ designers

    Increase in modifications and reduction in CS requests

  • Booking.com mobile screens for help, contact options and cancellation policy
    Designing and launching the Booking.com help centre to enable customers to diagnose and resolve their support needs
  • The 2020 H2 design roadmap: features, product exploration and entry-point experiments plotted from August into 2021, with a colour key and a coverage estimate rising below
    Setting quarterly design strategy aligned with product & engineering for the department
  • Warwick is a talented design leader with a wealth of craft experience across B2B and B2C product development at scale — always data-informed, goal-oriented and commercially aware. He has been indispensable in shaping product strategy and delivering exceptional hands-on execution.
    KristynaGPM Post-Book Experience, Booking.com
  • A flow diagram of the core trip experience, from trip level to booking detail, with mobile screens for each step
    Mapping the core trip flow for stakeholders
  • A wide Figma file laying out the end-to-end trip journey screen by screen, with designer avatars pinned to sections
    Setting rituals as a team to enable holistic customer journey reviews

Other moments of pride

  • Talking with a group of students at a Miro stand at a careers fair, beside a hiring sign for design graduates

    Miro

    Launching and leading the Miro Design Graduate Program

  • Warwick on stage in front of a slide reading "but design was never about being average", speaking to a seated audience

    WONDER Festival 2026

    Speaking in front of designers & students on Design & AI

  • A colleague presenting clustered sticky notes on a glass wall to two teammates

    Booking.com

    Facilitating design thinking trainings and designer onboarding programs

Principles

How I approach the work.

Deep understanding of why

Getting beyond the superficial features and understanding users, customers, and the business's goals, values, and impacts can help designers create a better end-to-end holistic experience.

Strong opinions, loosely held

Forming opinions early is great and allows us to shape directions, but we want to validate those opinions with the business, with customers, and with data as soon as possible, and not hold on to those opinions to be a detriment in the process.

Mix art and science

Functionality and beauty isn't a trade-off. It's design's role to bring the two together and create a beautiful functional product.

Own the details

Great products live in the small details. Designers should own them, and as a leader my job is to build a team that can actually ship them.

Trust over process

When the team trusts me, I trust them, and leadership trusts design, the process can get out of the way. Teams stop managing up and start doing their best work.

Off the clock.

Brisbane born, Amsterdam based since 2016. Here is a view into what keeps me going outside of work.

Squash

I play a few times a week, at a reasonably serious level. The irritating thing about squash is that the dull stuff wins matches. Footwork, length, turning up when you would rather not. Product work is much the same: the fundamentals quietly compound, and the shortcuts catch up with you.

Two players sitting against the back wall of a squash court, catching their breath after a match
Three players holding a trophy and drinks after a club tournament
A large group of players gathered on court with their rackets, looking up at the camera
Two players mid-rally, seen through the glass back wall of a court
A player lunging low to reach the ball while his opponent watches from behind
Poster for the NK Masters 2026 tournament in Rotterdam, showing a player following through on a shot

Photography

Pretty basic, honestly. The enjoyment is in the exploring and the noticing. It gets me outside, and feeds a different kind of creative need.

Furled parasols along a poolside at dusk, the pink sky and a low moon mirrored in still water
A sunlit small-town main street with iron-lace verandahs and utes parked along the kerb
A figure in a yellow hood crossing an empty road in thick fog, a single headlight behind them
Low autumn sun down an Amsterdam canal, a walker silhouetted on a pavement of fallen leaves
Shoppers on a stone street at sunset, long shadows thrown toward the camera
A man in a puffer jacket crossing a wide Sicilian piazza toward a pink baroque palazzo
A man in a white cap cycling across an empty sunlit square past shuttered arcades
Four older men sitting talking on a bench in the shade, glimpsed between parked cars
A Naples side street seen from under a dark arch, balconies and washing lines above the cobbles
A crowded Naples street packed shoulder to shoulder between tall balconied buildings
A woman walking through a colonnade of riveted iron pillars under a railway, backlit by daylight
A woman leaning on a canal bridge between parked bicycles, a church tower catching the last sun
A cyclist blurred to a smear of red passing a lit brick wall beneath a railway bridge at night
A cyclist and a runner framed by the dark ironwork of a bridge, water and trees beyond
A narrow Barcelona alley in shadow, a single figure crossing the bright gap at the far end

Travel

Being an Australian in Europe means everywhere is suspiciously close. I am more interested in the people and the history than the landmarks, and will happily lose an afternoon just walking and exploring.

The pyramids at Giza rising from open desert under a bright hazy sky
Hot air balloons drifting over desert at sunrise, the nearest one carrying the Moroccan flag
A narrow trodden path through deep snow in a forest at night
Horses grazing on flooded green marshland under heavy cloud
The Tiber in Rome, a stone arch bridge crossing it and the dome of St Peter's beyond
Sandstone buttes standing over a green oasis and lake in the Egyptian desert
Lakes and scrub spreading across pale desert under a heavy grey sky
A waterfall pouring off a cliff with a rainbow arcing through the spray

Usually picking up something new, with mixed results.

Let's talk.

© 2026 Warwick Kay